Exemplarily analysis cycle

Requiry of customer

Possibilities of requiry:

  • E-mail-requiry
  • Telephone-requiry 0049 (0) 7465/909076
  • Contact formular

Check of customer specification at CleanControlling

Clearance of analysis details

  • By telephone or per e-mail
  • While a visit of our laboratory

Offer

Dependent on complexity of customer specification you will reach the offer after 1 or 2 working days.

Order from customer and delivery of parts to CleanControlling

Packaging of the parts for transport:

  • Packaging alternative 1: It should be choosen a packaging wich avoid creation of particles while transport (e. g. closed plastic bag)
  • Packaging alternative 2: Simulation of customers delivery with original packaging of the parts

Receipt of parts at CleanControlling

  • Visuell check of the packaging. Faulty or damaged packaging will be documented at CleanControlling.
  • Collection of all analyse information from order
  • Draw up an analyse instruction with the information from customer and the according specification.

Qualification of extraction method

The extraction method will be qualified by decay curve.

Start of analysis

  • Preparation of analyse equipment
  • Basic cleaning of the according extraction equipment

to top

News

27.05.2010

VDA Band 19 Teil 2 - Technische Sauberkeit in der Montage -  als Gelbdruck ab sofort verfügbar.

Beachten Sie unser aktuelles Schulungsangebot zum VDA Band 19  Teil 2

Aufgrund der Mitarbeit bei der Erstellung des VDA Bands sind wir in der Lage Sie in die Inhalte des Bandes schnell und unkompliziert einzuführen.

Link zum kostenlosen Download

alle news

 

 

 
DEUTSCH | ENGLISH